Kimball’s Bathroom Diary – Demolition begins!

Design phase over – remodeling phase begins!

We spent the day removing all the existing fixtures and cabinetry.  We found a couple of surprises – very typical with a remodel.  We found rotted wood below the tub from a slow leak so we replaced a joist and the subfloor.

Here is where we are starting:

Now we remove tub + shower fixtures, surround, toilet, cabinetry, sink + faucet.

All the way down to the studs!  See how we carefully covered the floor as the Kimballs wanted to keep it.

Next step – framing.

Please go to our Kimball Portfolio page to see the whole project unfold!